Week 2 of Kitchen Remodel - One Room Challenge Link Up

Hi there!

Well it's been a busy week!  If you missed last week's post about the challenge of remodeling a kitchen in 6 weeks, click here for Week 1.

The kitchen started out like this:


And here it is today:


The overhead hanging cabinets have been removed, and the doors and drawers of the existing cabinets have all been replaced with shaker style fronts.  It's amazing how much more light and airy the kitchen feels without those hanging overhead cabinets!

Extra storage was needed in this tiny kitchen, so we had the cabinet maker create some more space:


Our plan is to have carrera marble countertops, white cabinets and a white tile backsplash like this:


The linoleum floor will also be replaced by hardwood flooring and I'm excited about the new lighting that will be installed.

I created this design board for my clients with some ideas about how it will all pull together:



Next week we hope to have the carrera and tile installed!  

Be sure to check out all the ORC Link Up participants at Calling it Home!

Stay tuned!